Soil reports

My soil report says Class P. Should I be worried?

Opening a soil report that says Class P, problem site, can be unsettling. In most cases it is not a problem without a solution.

The short answer

Usually not. Most soil reports come back Class P. In most cases it means common solutions familiar to most builders, with footings designed by an engineer. Some sites are very difficult and can make a project uneconomic, but they are rare. This guide is about residential building.

On this page
0.3 m

What a soil report does

A soil report, formally a soil site classification report, tells the structural engineer what to allow for in the slab and footing design, so the footings are strong and stiff enough to resist soil movement, seasonal moisture changes, fill and low soil strength. It is prepared to AS 2870, Residential slabs and footings, by a suitably qualified geotechnical consultant or engineer, and lodged with your building permit documents.

A soil report sets out
  • What the soil is made of: clay, silt, gravel, sand, rock or fill
  • Its properties: profile, reactivity, moisture and strength
  • Anything affecting its normal moisture
  • Any fill, its type and characteristics
  • Suitable founding conditions: footing depth and soil strength
0.6 m

What reactivity means

Site classes are based on reactivity, which is how much a soil shrinks and swells as its moisture changes. Gravel and sand have very low reactivity. Most silts lose strength when very wet. Clay is the main cause of footing movement and of most Class P sites. Picture a sponge: it shrinks when dry and swells when wet. Clays behave the same way, from slightly reactive to extremely reactive.

Every report gives a site class to AS 2870
ANon-reactive
SSlightly reactive
MModerately reactive
H1Highly reactive
H2Very highly reactive
EExtremely reactive
PProblem site
0.9 m

What Class P actually means

Under AS 2870, problem means the soil's normal characteristics on that site have been changed in a way the footing design must allow for. The report writer must give a Class P whenever the soil is not in its normal state.

Sites get Class P because of
  • Trees and vegetation drying out clay soils
  • Existing buildings and paving covering the soil, or leaking services and poor drainage wetting it
  • Former trees, buildings or structures whose drying effect has been removed
  • Septic tanks, dams or groundwater
  • Fill placed over the natural soil
  • Mining activity, such as mine shafts and mullock
  • Saturated or soft soils that lose bearing strength
  • Steep slopes at risk of slipping
1.2 m

Why most house blocks are Class P

The normal site AS 2870 describes is rare in real life. It would be a strip of land with no significant vegetation and no previous human activity. New estates usually have street trees near the building envelope and some subdivision fill. Renovations and extensions almost always have abnormal moisture from the existing house. Shallow rock can cancel out abnormal moisture, because rock does not react to water, but most sites still come back Class P.

1.5 m

What happens next

Your footings are designed by an engineer, with a little more thought than a normal site needs. Our reports include recommendations for that engineer, such as an H1 equivalent slab on a moderately reactive site affected by trees, or a fully suspended slab on bored piers where there is fill or mining. If you are concerned, talk to one of our engineers or your builder.

Tell us what you are seeing.

Call during business hours, or send the details and a few photos and we will be in touch to talk it through.

(03) 5333 3030

Mon to Fri, 9am to 5pm
mail@mcclellands.com.au
201 Armstrong St North, Soldiers Hill, Ballarat VIC 3350

Photos help us understand the problem.
Call (03) 5333 3030Book a soil test